---
product_id: 86136901
title: "10M HDMI Cable v1.4 lead HIGH SPEED Long Lead with Ethernet ARC 3D | Full HD 1080P PS4 Xbox One Sky HD TV Laptop PC Monitor CCTV"
brand: "finesse cables"
price: "$18.27"
currency: USD
in_stock: false
url: https://www.desertcart.ec/products/86136901-10m-hdmi-cable-v1-4-lead-high-speed-long-lead
store_origin: EC
region: Ecuador
---

# Supports PS4/Xbox 10m length ARC & Dolby support 10M HDMI Cable v1.4 lead HIGH SPEED Long Lead with Ethernet ARC 3D | Full HD 1080P PS4 Xbox One Sky HD TV Laptop PC Monitor CCTV

**Brand:** finesse cables
**Price:** $18.27
**Availability:** ❌ Out of Stock

## Summary

> 🎉 Elevate Your Entertainment Experience!

## Quick Answers

- **What is this?** 10M HDMI Cable v1.4 lead HIGH SPEED Long Lead with Ethernet ARC 3D | Full HD 1080P PS4 Xbox One Sky HD TV Laptop PC Monitor CCTV by finesse cables
- **How much does it cost?** $18.27 with free shipping
- **Is it available?** Currently out of stock
- **Where can I buy it?** [www.desertcart.ec](https://www.desertcart.ec/products/86136901-10m-hdmi-cable-v1-4-lead-high-speed-long-lead)

## Best For

- finesse cables enthusiasts

## Why This Product

- Trusted finesse cables brand quality
- Free international shipping included
- Worldwide delivery with tracking
- 15-day hassle-free returns

## Key Features

- • **Durable Design:** Double shielded and PVC wrapped for ultimate protection.
- • **Unmatched Length:** Experience 10 meters of freedom in your setup!
- • **Future-Proofed Audio:** Supports advanced audio formats like Dolby Atmos.
- • **High-Speed Performance:** Enjoy crystal-clear 1080p visuals at 60Hz.
- • **Universal Compatibility:** Connects seamlessly with all your favorite devices.

## Overview

The Finesse Cables 10M HDMI Cable v1.4 is a high-speed, long lead cable designed for optimal audio-visual performance. With gold-plated connectors, it supports resolutions up to 1080p at 60Hz and is compatible with a wide range of devices including gaming consoles, TVs, and projectors. Its durable design ensures longevity, while features like Ethernet and ARC support enhance your home cinema experience.

## Description

Finesse Cables 10M HDMI Cable v1.4 lead HIGH SPEED Long Lead with Ethernet ARC 3D | Full HD 1080P PS4 Xbox One Sky HD TV Laptop PC Monitor CCTV : desertcart.co.uk: Electronics & Photo

## Features

- [10 meter HDMI cable] - High speed HDMI to HDMI v1.4 long cables include Ethernet and ARC. Our connectors are gold plated providing excellent audio-visual signal transmission for vibrant picture and sound. Please note this cable is suitable for resolutions up to 2k HD 1080p at 60hz, it does not support 4k.
- [High Quality] - All Finesse Cables HDMI are manufactured under official license from HDMI. They are double shielded to protect from interference and wrapped in a durable PVC covering to allow easy routing without risk of damage.
- [Universal Compatibility] – Finesse HDMI Cables are compatible with a wide range of devices that support HDMI. These include TV, CCTV, Sky, Playstations, Xbox, Projectors, Home Cinema, DVD Players, Sound Bars, Freeview Boxes, Games consoles, PC, Laptops. These cables are suitable for resolutions up to 1080p
- [High specification] – All Finesse Cables are high in specification including Ethernet, 3D and ARC (Audio Return Channel) support. Your TV soundbar and home cinema HD surround sound audio are covered including 5.1 & 7.1 Dolby Atmos and DTS X audio. High picture resolutions from 720p, 1080i and 1080p at up to 60Hz. Crystal clear picture and sound even across our longer length cables.
- [Wide range] - Finesse cables offer a huge range of professional quality HDMI cables from 1m - 50m (v1.4 2k 1080p). All have a 2-year warranty as standard.

## Technical Specifications

| Specification | Value |
|---------------|-------|
| ASIN | B07GZR5YX7 |
| Best Sellers Rank | 1,760 in HDMI Cables |
| Brand | Finesse Cables |
| Cable Type | HDMI |
| Colour | Black |
| Compatible Devices | TV, Playstation, Xbox, DVD, CCTV, Sky TV, Cable, PC, Laptop, projector, home cinema, AV |
| Compatible Phone Models | No Compatible Phone Models |
| Connectivity Technology | HDMI |
| Connector Gender | Male-to-Male |
| Connector Type | HDMI |
| Customer Package Type | sealed anti-static bag |
| Customer Reviews | 4.5 4.5 out of 5 stars (914) |
| Data Transfer Rate | 18 Gigabits Per Second |
| Ethernet Cable Category | Cat 5e |
| Frequency | 60 Hz |
| Indoor Outdoor Usage | Indoor |
| Item Length | 10 Metres |
| Item Shape | Round |
| Item Weight | 500 Grams |
| Manufacturer | Finesse Goods |
| Manufacturer Part Number | HDMI |
| Model Name | HDMI V1.4 |
| Model Number | HDMI V1.4 |
| Number of Items | 100 |
| Number of Pins | 19 |
| Other Special Features of the Product | Low Voltage |
| Outer Material | [Predicted] PVC |
| Recommended Uses For Product | Connecting DVD players, games consoles, projectors, cable & satellite boxes to TV screen. PC and Laptops to monitors |
| Specification Met | hdmi |
| UPC | 604565186294 |
| Unit Count | 1.0 count |

## Product Details

- **Brand:** Finesse Cables
- **Cable type:** HDMI
- **Compatible devices:** TV, Playstation, Xbox, DVD, CCTV, Sky TV, Cable, PC, Laptop, projector, home cinema, AV
- **Connector type:** HDMI
- **Special feature:** Low Voltage

## Images

![10M HDMI Cable v1.4 lead HIGH SPEED Long Lead with Ethernet ARC 3D | Full HD 1080P PS4 Xbox One Sky HD TV Laptop PC Monitor CCTV - Image 1](https://m.media-amazon.com/images/I/41D2uCf-4wL.jpg)
![10M HDMI Cable v1.4 lead HIGH SPEED Long Lead with Ethernet ARC 3D | Full HD 1080P PS4 Xbox One Sky HD TV Laptop PC Monitor CCTV - Image 2](https://m.media-amazon.com/images/I/41MpTLrBQQL.jpg)
![10M HDMI Cable v1.4 lead HIGH SPEED Long Lead with Ethernet ARC 3D | Full HD 1080P PS4 Xbox One Sky HD TV Laptop PC Monitor CCTV - Image 3](https://m.media-amazon.com/images/I/41nwcTjz-NL.jpg)
![10M HDMI Cable v1.4 lead HIGH SPEED Long Lead with Ethernet ARC 3D | Full HD 1080P PS4 Xbox One Sky HD TV Laptop PC Monitor CCTV - Image 4](https://m.media-amazon.com/images/I/31odsAkuLwL.jpg)
![10M HDMI Cable v1.4 lead HIGH SPEED Long Lead with Ethernet ARC 3D | Full HD 1080P PS4 Xbox One Sky HD TV Laptop PC Monitor CCTV - Image 5](https://m.media-amazon.com/images/I/71tHPbk2f6L.jpg)

## Available Options

This product comes in different **Colour Name, Size Name** options.

---

## Why Shop on Desertcart?

- 🛒 **Trusted by 1.3+ Million Shoppers** — Serving international shoppers since 2016
- 🌍 **Shop Globally** — Access 737+ million products across 21 categories
- 💰 **No Hidden Fees** — All customs, duties, and taxes included in the price
- 🔄 **15-Day Free Returns** — Hassle-free returns (30 days for PRO members)
- 🔒 **Secure Payments** — Trusted payment options with buyer protection
- ⭐ **TrustPilot Rated 4.5/5** — Based on 8,000+ happy customer reviews

**Shop now:** [https://www.desertcart.ec/products/86136901-10m-hdmi-cable-v1-4-lead-high-speed-long-lead](https://www.desertcart.ec/products/86136901-10m-hdmi-cable-v1-4-lead-high-speed-long-lead)

---

*Product available on Desertcart Ecuador*
*Store origin: EC*
*Last updated: 2026-11-27*